Pops92
Full Member
Mine have just given up on me left hand one really. My fault lack of lubrication.
Got in touch with Charnwood waiting time 2 months and 40 quid plus postage when they come.
Luckily they have a list of generic ones on other lathes. 2 are Axminster, email and for 26 quid 2 pulleys on the way. 20 quid saved
Got in touch with Charnwood waiting time 2 months and 40 quid plus postage when they come.
Luckily they have a list of generic ones on other lathes. 2 are Axminster, email and for 26 quid 2 pulleys on the way. 20 quid saved