Not posted much as I try to keep this thread to a minimum but I like to add the odd bit to show I am still doing something in the workshop. I did check my wood store for a piece of wood for another turning project.
Anyway since the last update I have made the cylinder liner and some of the machining to the piston. I am now working on the head assembly the size can be seen where I am holding the head.
[ATTACH]50216[/ATTACH][ATTACH]50217[/ATTACH]
Most of the holes are drilled in the head and the valve guides made and inserted these needed to be fitted before some more holes are drilled as well as act as guides for another hole.
[ATTACH]50218[/ATTACH]
[ATTACH]50219[/ATTACH][ATTACH]50220[/ATTACH][ATTACH]50221[/ATTACH]
Just a quick couple of photo with the valves inserted
[ATTACH]50222[/ATTACH][ATTACH]50223[/ATTACH]