The con rod is now complete with the split bearing
[ATTACH]50639[/ATTACH]
On to the crankshaft the parts machined to size and drilled where needed
[ATTACH]50640[/ATTACH]
The crank was assembled by loctiting the parts together then cross drilling and pinning with a tapered pin once they are set the pins are cleaned up and cannot be seen
[ATTACH]50635[/ATTACH][ATTACH]50636[/ATTACH]
The next job was fun as I had to use a 3/32" cutter to do the slots for some 1/8" this had to be done in three passes for each slot and was very slow as cutters this size will break very easy if pushed too hard
[ATTACH]50637[/ATTACH]
The finished crank with the centre pin removed as that was keeping the parts in alignment whilst it was pinned together and any other jobs
[ATTACH]50638[/ATTACH]