Worked out what wood is needed for the shed rebuild as well as roofing material now all ordered. so spent some time on other little jobs that I keep meaning to do.
Well, the second vice which had a broken handle when I got it and the other I managed to break. Have made two simple handles up out of 3/4" Ali bar drilled and filed square as well as make a couple of Corian handles. I used a 6mm furniture bolt that I ground down the head and made a recess in the Corian. I glued in a brass tube in the Corian as well as used another brass sleeve for it to rotate on as well as to stop the bolt thread wearing out the Corian as it rotates.
Tomorrow will be moving wood when it arrives and the start of the build will begin
Well, the second vice which had a broken handle when I got it and the other I managed to break. Have made two simple handles up out of 3/4" Ali bar drilled and filed square as well as make a couple of Corian handles. I used a 6mm furniture bolt that I ground down the head and made a recess in the Corian. I glued in a brass tube in the Corian as well as used another brass sleeve for it to rotate on as well as to stop the bolt thread wearing out the Corian as it rotates.
Tomorrow will be moving wood when it arrives and the start of the build will begin